Projekt template Embedded Systems WS2019/Initiale Anforderungen: Unterschied zwischen den Versionen

Aus Verteilte Systeme - Wiki
Zur Navigation springen Zur Suche springen
Zeile 5: Zeile 5:
 
*Req_01: Microcontroller should be able to operate all the sensors and actuators.
 
*Req_01: Microcontroller should be able to operate all the sensors and actuators.
   
*Req_02: Surface of the Product should provide an accurate goods placing
+
*Req_02: Surface of the Product should provide an accurate goods placing.
   
*Req_03: The Product should avoid collisions
+
*Req_03: The Product should avoid collisions.
   
 
*Req_04: The Product should be able to find the delivery goal point and wait there until a new delivery request is received.
 
*Req_04: The Product should be able to find the delivery goal point and wait there until a new delivery request is received.
Zeile 15: Zeile 15:
   
 
* (R01) Developer : He should choose the components, write the software and assembly the end Product/Prototype.
 
* (R01) Developer : He should choose the components, write the software and assembly the end Product/Prototype.
* (R02) End User : End User can be Receiver or Sender of goods. He will request the service (Send or Receive)
+
* (R02) End User : End User can be Receiver or Sender of goods. He will request the service (Send or Receive).
   
   
Zeile 41: Zeile 41:
   
 
* (Req_01, nf) : Microcontroller should be able to operate all the sensors and actuators(M01)
 
* (Req_01, nf) : Microcontroller should be able to operate all the sensors and actuators(M01)
* (Req_02, f) : Surface of theProduct should provide an accurate goods placing
+
* (Req_02, f) : Surface of theProduct should provide an accurate goods placing.
* (Req_03, f) : The Product should avoid collisions (M01, M03)
+
* (Req_03, f) : The Product should avoid collisions (M01, M03).
 
* Req_04, f): The Product should be able to find the delivery goal point and wait there until a new delivery request is received(M03, M04).
 
* Req_04, f): The Product should be able to find the delivery goal point and wait there until a new delivery request is received(M03, M04).
 
== Tests and Simulation ==
 
== Tests and Simulation ==
Zeile 51: Zeile 51:
 
**Color Sensor: Check against the two color used with variation of the environment light.
 
**Color Sensor: Check against the two color used with variation of the environment light.
 
**Reflective Optical Sensor: Check against a line by moving the two sensors to left and right of the line.
 
**Reflective Optical Sensor: Check against a line by moving the two sensors to left and right of the line.
**Assembly and test again every single sensor/actuator
+
**Assembly and test again every single sensor/actuator.
 
</br>
 
</br>
 
*Software in Assembly Product and test scenario:
 
*Software in Assembly Product and test scenario:

Version vom 22. November 2019, 13:31 Uhr

Initial Requirements

  • Req_01: Microcontroller should be able to operate all the sensors and actuators.
  • Req_02: Surface of the Product should provide an accurate goods placing.
  • Req_03: The Product should avoid collisions.
  • Req_04: The Product should be able to find the delivery goal point and wait there until a new delivery request is received.

Datei:EM2019WSP06.pdf

Stakeholder Role

  • (R01) Developer : He should choose the components, write the software and assembly the end Product/Prototype.
  • (R02) End User : End User can be Receiver or Sender of goods. He will request the service (Send or Receive).


Milestones

  • (M01) Interface and control of Sensors and Actuators.
  • (M02) Assembly of the Product.
  • (M03) Development of the functionality algorithm.
  • (M04) Boot can deliver a good to a designated location.


Uses Case

(UC01)

(UC02)

Requirements and Milestones

f = functional, nf = not functional

  • (Req_01, nf) : Microcontroller should be able to operate all the sensors and actuators(M01)
  • (Req_02, f) : Surface of theProduct should provide an accurate goods placing.
  • (Req_03, f) : The Product should avoid collisions (M01, M03).
  • Req_04, f): The Product should be able to find the delivery goal point and wait there until a new delivery request is received(M03, M04).

Tests and Simulation

  • Hardware:
    • Ultrasonic: Read the Distant and check against a physical distant measure.
    • Motors: Monitoring of direction and speed of rotation.
    • Color Sensor: Check against the two color used with variation of the environment light.
    • Reflective Optical Sensor: Check against a line by moving the two sensors to left and right of the line.
    • Assembly and test again every single sensor/actuator.


  • Software in Assembly Product and test scenario:
    • Design the Matrix where the Product should work.
    • Test if line can be followed.
    • Test if Rotations are accurate.
    • Test if Obstacle can be detected.
    • Test if Colors can be detected.
    • Test if a delivery without obstacles can be done.
    • Test if a delivery with obstacles can be done.
    • Change test scenario and repeat.